hit counter code

Installation - Flush-Fit - Miele SmartLine Operating And Installation Instructions

Downdraft extractor
Table of Contents

Advertisement

Installation – flush-fit
If the worktop is more than 28 mm
deep, it must be cut out underneath
on the building-in side on the right or
left hand side.
a Worktop
b Maximum 24 mm
c 12 mm
Securing the brackets
1 bracket (supplied with the spacer bar)
must be secured centrally to the right or
left-hand side of the cutout.
Wooden worktops
 Fit the bracket so that it sits flush
with the top edge of the lower step of
the stepped cutout.
 Secure the bracket with the
3.5 x 25 mm wood screws supplied.
Natural stone worktops
You will need heavy-duty double-
sided tape (not supplied) to secure the
bracket.
 Stick the tape onto the upper edge of
the lower step of the stepped cutout.
 Fit the bracket so that it sits flush
with the top edge of the lower step of
the stepped cutout.
 Press the bracket firmly into position.
Installation
69

Advertisement

Table of Contents
loading

Table of Contents