Installation Plan Tumble dryer PT 8407 D (Steam Heated) en – US 23.15 M.-Nr. 10 002 520...
Page 2
U.S.A. Miele, Inc. National Headquarters 9 Independence Way Princeton, NJ 08540 Phone 800-991-9380 Fax: 609-419-4241 www.mieleusa.com Technical Service & Support Nationwide Phone: 800-991-9380 Fax: 800-220-1348 proservice@mieleusa.com It is essential to read the operating and installation instructions before installing, commissioning or using the machine.
Page 10
Standard installation Option: Installation on concrete base (BS) PT 8407 D - measurements in millimeters...
Page 11
Connection using multi-pole wall socket in compliance with IEC/EN 60309 and IEC/EN 60947 is recommended in order to simplify electrical tests. If machines are hard-wired, a multi-pole switch must be provided on site. A wall socket or isolator must be accessible after installation. Installation plan: PT 8407 D Date: 16-Oct-2014 Page: 11...
Page 12
19 11/16“ 500 mm The supply lead for the electric steam valve is included. The steam valve should be installed close to the steam connection. Note installation instructions for steam-heated Miele tumble dryers. Condensate Connection thread (on site) ½" internal thread...
Page 13
63” [1.6 m]) Installation should only be carried out by authorized installers in accordance with all local and national regulations. Follow installation instructions when installing machine! All rights reserved. Installation plan: PT 8407 D Date: 16-Oct-2014 Page: 13...