Page 1
Installationsplan / Installation plan Installatietekening Plano de instalación Asennusohje Plan d`installation Plano de instalação Installasjonsplan Pianta di installazione Σχέδιο εγκατάστασης Installationsplan PT 7251 EL Materialnummer Mat. no.: 06 478 800 Änderungsstand Version: Datum Zeichnung Drawing date: 23.09.2004 Datum Legende Legend date:...
Peak load Connection cable, min. cross-section mm² 3 × 1.5 management Input leads should not be in direct contact with any source of heat. Signal supplied via potential-free (galvanically separated) contact. Installationsplan PT 7251 EL Stand: 23.09.2004 Seite 7...
Page 7
(measured at a distance of 1 m from the machine and at a height of 1.6 m) Installation should only be carried out by authorised fitters in accordance with valid regulations! Observe installation instructions when installing machine! All rights reserved! Installationsplan PT 7251 EL Stand: 23.09.2004 Seite 8...