hit counter code

Downtime After Installation; Levelling The Tumble Dryer - Miele PDR 1108 HP SmartBiz Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Installation

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.

Levelling the tumble dryer

To ensure proper operation, the tumble
dryer must stand perfectly level. The
screw feet on the tumble dryer can be
adjusted to compensate for unevenness
in the floor.
60
 Turn the screw feet by hand or with a
flat open spanner.
This tumble dryer is not suitable for
building under.
Never block the ventilation slots on
the tumble dryer. Do not block the
gap between the bottom of the
tumble dryer and the floor with plinth
facings, deep pile carpet etc. This
would hinder a sufficient flow of air to
the tumble dryer.

Advertisement

Table of Contents
loading

Table of Contents